Spring Hill water and sewer bills: how they work, what they cost and the sewer moratorium
Most Spring Hill homes get a single monthly statement from the city covering water, sewer, stormwater, trash and recycling. This guide walks through who sends it, how to read it, what the rates are and why they climbed, what to do about a high bill, and where the sewer limits stand, which are the source of most of the questions we get. It links to our reporting for the full stories and keeps the broader picture here. For water quality, electric, gas and internet, see our utilities guide.
Who bills you
If you live in the city’s water service area, your bill comes from the city’s Utility Billing Department at City Hall, which, per the city, handles monthly water, sewer, garbage, recycling and stormwater fees on one statement. The city’s water comes from the Duck River, and its wastewater plant discharges treated water back to the river, the city explains.
Not every Spring Hill address works that way. The city shares territory with neighboring water utilities. Its own code sets a $750 territorial charge when it connects a property that falls inside the boundaries of the H.B. & T.S. Utility District, a Williamson County nonprofit that has provided drinking water since 1968 in Hillsboro, Burwood and Thompson’s Station. We could not find a published map of who serves which streets. If you aren’t sure, your most recent bill answers it, and Utility Billing can confirm an address.
| If your bill comes from | It covers | Contact |
|---|---|---|
| City of Spring Hill | Water, sewer, stormwater, trash and recycling, on one statement | 931-486-2252 |
| H.B. & T.S. Utility District | Water only. Ask which utility handles your sewer and trash. | 615-794-7796 |
| Maury County Water System | Water for some areas inside the city east of I-65, per a 2018 city staff memo. Confirm for your address. | 931-381-8900 |
| Columbia Power & Water | Sells water wholesale to Spring Hill and other systems | n/a |
Columbia comes up for two reasons. Its utility sells water at wholesale to Spring Hill and other systems, the Tennessee Lookout reported, and it is the planned destination for some of Spring Hill’s wastewater (see the sewer section). Columbia also raised its water rates by up to 20% a year for five years, which its utility said will affect its own customers and the other systems that buy from it. The vote came up in Columbia’s city election, as we noted in our election results post. We haven’t seen Spring Hill say it will pass any of that on to its bills, and the city’s July 2026 rate announcement doesn’t mention it.
Next door in Thompson’s Station, water is also from H.B. & T.S., and the town bills sewer separately for some subdivisions based on that water use. Electric, gas and internet are separate accounts; our utilities guide lists them.
How to read your bill
A Spring Hill statement is a stack of flat monthly fees plus two charges that depend on how much water you use. Here is a recreated example, with every line explained. It is built from the city’s published rate schedule, not from anyone’s real bill.
- 1Account number and usage. Your account number is how every city office finds you. The usage line is the gallons the meter recorded since the last read. Water and sewer both start from this one number.
- 2Water base charge. A flat monthly charge for being connected, no matter how much you use. Inside the city, a standard home meter pays the “Water Inside” base on the rate schedule.
- 3Water usage. Priced per 1,000 gallons in three steps: the first 4,000, the next 6,000 (4,000 to 10,000), then everything over 10,000. Each step costs more per gallon. If your statement shows these as one line, the math is the same.
- 4Sewer base charge. A second flat charge, billed to every sewer customer whether or not you use any water.
- 5Sewer usage. The city doesn’t meter what goes down your drain. It bills sewer on the water that passes through your meter, at one flat rate per 1,000 gallons. That’s why a leak, or a sprinkler on your house meter, raises the sewer line too.
- 6Stormwater fee. A flat monthly fee for managing runoff, not tied to water use. On larger lots it is multiplied by the amount of hard surface.
- 7Trash, recycling and city services. Curbside pickup is billed on the same statement, and covered in our trash guide. It doesn’t depend on water use.
- 8Amount due and due date. Bills are due by the 15th. After that a 10% late fee is added and a final notice is mailed, and unpaid accounts can be disconnected after the 25th, per the city’s application.
The timing
Meters are read once a month, per city code, around mid-month. The service application says the 15th and the billing page says the 20th, so don’t hang anything on the exact day. Bills go out by the 1st and cover the previous month’s use, so what you pay in one month reflects water you used the month before. Usage is counted in 1,000-gallon increments. The bill is due by the 15th. If it isn’t paid, a 10% late fee is added and a final notice goes out soon after, and the account can be cut off after the 25th. Ahead of any shutoff, city code says you have the right to be heard by a city employee if you dispute the amount.
Why sewer is the bigger number
The city bills sewer on the water that goes through your meter, “at a higher rate than the water,” in its words. At the July 2026 rates a home using 5,000 gallons pays about $57 for water and about $73 for sewer. The sewer line follows your water use month by month. The city’s documents don’t describe any seasonal averaging, so a summer of watering the lawn raises both lines. The one exception is a separate irrigation meter, covered under high bills.
What a typical month costs
These are the water, sewer and stormwater charges at various usage levels, before the roughly $24.55 for trash, recycling and city services. Use the slider to try your own number.
| Gallons in a month | Water | Sewer | Stormwater | Subtotal |
|---|---|---|---|---|
| 3,000 | $41.65 | $54.19 | $8.00 | $103.84 |
| 5,000 | $57.35 | $73.31 | $8.00 | $138.66 |
| 8,000 | $83.51 | $101.99 | $8.00 | $193.50 |
| 10,000 | $100.95 | $121.11 | $8.00 | $230.06 |
| 15,000 | $153.30 | $168.91 | $8.00 | $330.21 |
| 20,000 | $205.65 | $216.71 | $8.00 | $430.36 |
Estimate a monthly bill
Slide to the gallons used in a month. Estimate only, at the July 2026 rates, for a single-family home inside the city.
- Water
- $57.35
- Sewer
- $73.31
- Stormwater
- $8.00
- Trash, recycling, city services
- $24.55
- Estimated total
- $163.21
Sewer is 56% of the water-plus-sewer portion at this usage.
These tables apply the city’s three water tiers to each additional 1,000 gallons, which is how we read the schedule. The schedule doesn’t spell out the method, so treat the totals as close estimates, not what your bill will say to the penny.
Rates and rate changes
The City of Spring Hill’s rates are set by the Board of Mayor and Aldermen. In 2024 the board adopted Ordinance 24-07 for water, and a companion ordinance for sewer, which laid out three yearly increases on every July 1 starting in 2024. The July 2026 step is the last one in that schedule. The full set is on the city’s rate schedule, and the city posted the 2025-26 and 2026-27 numbers side by side on its rate-change announcement.
| Charge | July 2024 | July 2025 | July 2026 | 2025 to 2026 |
|---|---|---|---|---|
| Water base charge | $12.25 | $15.93 | $20.71 | +30.0% |
| Water, first 4,000 gal (per 1,000) | $4.13 | $5.37 | $6.98 | +30.0% |
| Water, 4,000 to 10,000 gal (per 1,000) | $5.16 | $6.71 | $8.72 | +30.0% |
| Water, over 10,000 gal and irrigation (per 1,000) | $6.19 | $8.05 | $10.47 | +30.1% |
| Sewer base charge | $15.09 | $19.62 | $25.51 | +30.0% |
| Sewer usage (per 1,000) | $5.65 | $7.35 | $9.56 | +30.1% |
| Stormwater fee (standard lot) | n/a | $7.75 | $8.00 | +3.2% |
| Trash, recycling, city services (total) | n/a | $24.25 | $24.55 | +1.2% |
Sources: the city’s rate schedule for water and sewer, and its rate-change announcement for stormwater and sanitation. The 2024 stormwater and sanitation figures weren’t in what we reviewed. Sanitation is trash, recycling and city services combined.
The city described the July 2026 change as about 30%. Our arithmetic on the city’s own numbers agrees: every water and sewer base and usage charge rose about 30% in July 2025 and again in July 2026 (between 29.96% and 30.09%), so a 5,000-gallon water-and-sewer bill went from $77.27 in 2024 to $100.49 in 2025 to $130.66 in 2026. That’s about 69% in two years. We computed all of these from the published schedule.
Water plus sewer only. Stormwater and trash are left out so the three years compare cleanly.
Stormwater went up a quarter ($7.75 to $8.00) and the sanitation total rose 30 cents, the city said; our trash guide covers the sanitation side. The stormwater fee is set to climb $0.25 a year. From July 1, 2027, the rate schedule says water and sewer rise every year by 3% or the change in the Consumer Price Index, whichever is greater.
Where the money goes
Water and sewer bills fund the water and sewer system and nothing else; the city says those projects can’t be paid for from general tax revenue. Our budget explainer shows the system running on roughly $36 million a year from bills, in an account separate from police and parks. The 2024 increases were adopted on June 3, 2024, according to city code, more than a year before the state’s order against the sewage plant, so they weren’t a response to it. The bigger bills ahead are the plant and water-supply rebuild, a roughly $320 million program the city’s water staff described to aldermen, per our moratorium explainer. We haven’t found an adopted rate plan to pay for it beyond the annual 3%-or-inflation formula.
One more piece: fees from new construction help pay for sewer capacity. Under city code, the sewer system development charge for a standard home connection is $3,035 as of July 2026, and the money goes into an account reserved for expanding and repairing the system. With the moratorium, development fees have dropped sharply, which we cover in the budget piece.
If your bill is high
Before you call, do the check that settles most cases. Turn off every faucet and appliance that uses water, then look at your meter. If the dial or low-flow indicator keeps moving, water is leaking somewhere. The usual suspect is a toilet that keeps refilling. Under city code, the piping on your side of the meter is yours to maintain, and because sewer follows water, a leak inflates the sewer charge too.
The common causes
- Irrigation. Sprinklers on your house meter are charged for water and for sewer. At the July 2026 rates every thousand gallons past the first 10,000 costs $20.03 (water $10.47 plus sewer $9.56). The city sells a separate irrigation meter for $3,001.65, paid by check, cash or money order, and it charges only the water rate, not sewer. Do the math first: at today’s sewer rate you’d need to water roughly 314,000 gallons to earn that back, and the rate schedule says water base charges apply to irrigation meters too, so the new meter carries its own monthly base charge.
- Filling a pool. The city can give a one-time sewer credit, because that water never reaches the sewer. Submit the pool fill-up form with the meter readings, dates and gallons. You have to be on city sewer to qualify.
- A rate step. If the bill jumped in July or August without a change in your habits, that’s likely the rate increase above, not a meter problem.
- A misread or a failing meter. Meters are read monthly, and mistakes and failures happen.
What you can ask the city to do
- A leak adjustment. Fix the leak first, then send the leak adjustment form, which must reach the city within 30 days of the leak. Attach the repair receipt or plumber’s invoice. Drop it at City Hall or email [email protected]. City code lets the city recompute a bill when a break on the customer’s side of the meter caused extraordinary charges, using your average past use. It says the city “may” do this, so adjustments aren’t guaranteed. The form doesn’t say whether the adjustment covers water, sewer or both, so ask.
- A special reading or a meter test. City code lets you ask for a re-read, which carries a fee unless it turns up a city error, or a test of the meter if you think it’s inaccurate. There is no charge if the test finds the meter is running against you.
- A hearing before shutoff. If you’re disputing an amount, call before the 25th. The delinquency notice must tell you who to talk to.
The city also publishes its other utility forms in one place. For active leaks, sewer spills or a pressure problem, skip billing and use the repair line in the phone list.
Paying and managing service
Ways to pay
Per the city’s service application, you can pay in person at City Hall (there’s also a night drop box out front), by mail to a lockbox in Nashville, by phone with a card or the automated line, online, in the city’s mobile app, or by text. Cash, check, money order and automatic bank draft carry no fee, while card payments add a processing fee. If you pay through your bank’s bill-pay, the account number must be entered in the full 10-digit format with its dashes (00-000000-00), and the mailing address is P.O. Box 306542, Nashville, TN 37230-6542.
Autopay. The city’s no-fee option is an automatic draft (ACH) from a checking account, set up with the authorization form that comes with the application packet. Even on autopay, keep an eye on the amount: the draft pays whatever the bill says.
Starting service
New accounts need the residential application, plus a photo ID for everyone on the account, submitted at least 24 hours before move-in. There’s a $50 non-refundable connection fee for new customers, and it’s waived if you’re already a customer or were one before. Balances on an old account must be cleared first. Email [email protected] or drop it at City Hall.
Stopping service
When you move out, submit the disconnection form. The city warns that if you don’t, the account stays in your name even after new residents move in, and you stay responsible for the bill. The base charges also start the day a meter is installed whether or not anyone is using water, per city code, so ask the city if a home will sit empty for a while.
If a bill goes unpaid
Past the 25th, service can be shut off. The reconnection fee is $25, or $50 if service is restored after 4:30 p.m. or on a weekend, and every charge must be paid first.
The sewer limits, explained
Sewage from city sewer customers goes to the city’s wastewater plant on Mahlon Moore Road, which treats it and discharges it to the river. State permit limits cap what the plant can discharge. Between 2023 and 2025 the city reported 29 violations of those caps to the state. In response, the Tennessee Department of Environment and Conservation (TDEC) issued a consent order that the city’s aldermen accepted on Aug. 5, 2025. That is a settlement-style order, with a $65,700 penalty, a required repair plan, and a ban on new sewer connections for projects without existing rights. The ban is the sewer moratorium. The order itself is public.
- 2020 to 2025State notices pile up
The Tennessee Department of Environment and Conservation (TDEC) issued notices of violation to the plant in 2020, 2021, 2023 and 2024, a federal court later recounted. Between 2023 and 2025 the city self-reported 29 violations of its discharge limits.
- 2024The three-step rate path is adopted
Ordinance 24-07 (water) and a companion sewer ordinance set three yearly steps starting July 1, 2024. That was a year before the consent order below.
- May 13, 2025Tennessee Riverkeeper gives notice
The environmental group sends the city its 60-day notice of intent to sue under the Clean Water Act.
- Aug. 5, 2025Aldermen accept the TDEC consent order
Resolution 25-183 accepts a $65,700 penalty and a moratorium on new sewer connections for projects without vested rights, the city announced.
- Sept. 2025The city lists who is already promised sewer
The vested-commitments list adds up to roughly 9,100 more homes and 13.7 million square feet of non-residential space, as the city posted and we laid out in our explainer.
- Sept. 11, 2025Riverkeeper files its lawsuit
The case, Tennessee Riverkeeper v. City of Spring Hill, goes to the federal court in Nashville.
- Nov. 12, 2025A state court makes the consent order a final judgment
Davidson County Chancery Court enters the order as a judgment by consent, according to the federal ruling that came later.
- Jan. 5, 2026The moratorium rules become city law
Ordinance 25-29 sets who keeps capacity and how the remaining capacity is handed out, including a discretionary reserve, per our explainer.
- June 2026Emergency declared at the plant
The board authorizes hauling sludge off-site because the plant can’t dewater it, per our reporting.
- July 1, 2026Last of the three rate steps
Water and sewer charges rise about 30% for the second straight year. The city said it first shows on the August bill.
- Sept. 4, 2026A federal judge keeps the lawsuit alive
The city argued the state consent order already settled everything. The judge denied the motion to dismiss, finding it unclear what the order actually covered. That is a ruling about the case moving forward, not about who is right.
- Oct. 8 and 19, 2026Columbia and Spring Hill agree to a wastewater pipeline plan
Columbia’s council and then Spring Hill’s board approve moving ahead with a pipeline to send wastewater to Columbia.
- No date setThe moratorium ends
The city has no announced end date. Per the city, it stays until the plant meets the order’s standards for 12 consecutive months, and TDEC must lift it in writing. More in our explainer.
Where the limits stand
The city turned the order into local law with Ordinance 25-29, passed Jan. 5, 2026. The consent order bars new sewer connections for projects without vested rights, with exemptions for critical infrastructure. Per our explainer, the ordinance also lets an existing building change uses if it won’t produce more wastewater, and sets aside a 100,000-gallon-a-day discretionary reserve the board can hand out case by case. Only 960 gallons a day of that reserve had been used as of early November, according to the same piece. Existing promises are the larger story: a September 2025 city list of vested commitments adds up to roughly 9,100 more homes, 13.7 million square feet of non-residential space and 1,498 hotel rooms. Our explainer quotes city water staff saying the city has committed to more capacity than the first phase of its rebuild provides.
There is no end date. The city says the moratorium stays until the plant meets the order’s standards for 12 consecutive months. The order’s own wording ties it to 12 consecutive months without a reported bypass or a large sewer overflow (over 400 gallons), and says it lasts until TDEC rescinds or modifies it in writing. TDEC can also grant partial relief if the city reduces stormwater getting into its sewer pipes or adds treatment capacity. The plant has improved since the order: city staff told aldermen in August that nitrogen discharges had fallen sharply and there had been no bypass since early June, per our explainer. The city says that doesn’t shorten the timeline.
What it means for you
- If you already live here: your service isn’t affected. You can renovate, sell and buy a home as usual, per our explainer.
- Your bill: the moratorium doesn’t set your rate. The 30% steps were adopted in 2024, a year before the order. What could matter more is who pays for the fix. Growth fees that used to help are down, and the rebuild is large. We haven’t found an adopted plan for rates beyond 2027’s formula.
- If you’re buying new construction: a lot or a builder’s promise isn’t the same as sewer capacity. Projects with vested rights can still connect, others are waiting. At June Lake, for instance, one 75-lot section has sewer allocation for only 14 homes. Ask the builder in writing whether your lot is covered. The consent order exempts only projects that already hold vested sewer rights. Our June Lake report, tracker and development map show what has and hasn’t been committed.
- If you’re a business: new restaurants and expansions can’t just add capacity. Per our explainer, several have had to ask the board for a share of the reserve. Our Medacta report looks at one large employer’s sewer situation.
The Columbia pipeline
The nearest-term relief is the plan approved on Oct. 19: a 12-inch sewer main from the Mahlon Moore plant, along Mahlon Moore Road and then a TVA easement for several miles, to Columbia’s system on its north side. The city puts the cost around $12 million, $9 million for the pipeline and $3 million for upgrades to the Carter’s Creek Pike pump station, all paid by Spring Hill, plus a usage rate paid to Columbia. It would carry at least 500,000 gallons a day and as much as 1.5 million. Columbia’s council voted for it on Oct. 8. The announcement gives no construction dates. This went further than when we published our moratorium explainer, so check that piece for the latest on timing.
The long-term fix is bigger: a rebuilt plant, new reservoirs, and an advanced purification system that loops treated water back through the supply. The city’s water staff put the cost around $320 million, with a final commissioning target of 2030, per our explainer. The city also finished a 2-million-gallon water tank south of Stonegate in October.
The Riverkeeper lawsuit
Separately from the state’s order, Tennessee Riverkeeper, a river advocacy group, sued the city in federal court in Nashville in September 2025. Its suit says the plant violated the Clean Water Act from 2020 into early 2025. The city asked the court to throw the case out, arguing the state consent order already covered it. In its Sept. 4 ruling, the court said it couldn’t tell what the consent order covers and wouldn’t dismiss the case at this early stage. The court noted the state order itself leaves room for further penalties and corrective action. A ruling that a case can proceed is not a finding that anyone broke the law, and the city has not admitted to the allegations in the consent order. What a final outcome would cost the city is unknown.
Who to call
Utility Billing’s number differs across city pages. 931-486-2252 is on the city’s rate sheet and forms, the billing page lists 931-329-4840, and the Water page lists 931-451-0964. Repair and after-hours numbers are from the Water page, and the Waste Management number is from the billing page. H.B. & T.S.’s number is on its website, and Maury County Water System’s is on its site. For missed pickups see our trash guide.
What we’re watching
We’ll update this guide when the board votes on the Columbia pipeline details and its timeline, when the court rules on what comes next in the Riverkeeper case, and when the city announces rates for the year after July 2026. Aldermen could also vote soon on allowing builders to lay pipe at their own risk in a moratorium area. Our moratorium explainer tracks that one.